造價(jià)通
更新時(shí)間:2024.12.28
雨水調(diào)蓄池設(shè)計(jì)

格式:pdf

大?。?span class="single-tag-height">15KB

頁(yè)數(shù): 2頁(yè)

Stormwater Management Pond Design Steps: 1. Feasibility study: Hydrology - Dry pond or wet pond? If receive and retain enough flow from rain, runoff, and groundwater to ensure long-term viability. Undrlying Soil - Underlying soils must be identified and tested. Soil permeability must be tested in the proposed Wet Pond location to ensure that excessive infiltration will not cause the WP to

某超大型地下雨水調(diào)蓄池結(jié)構(gòu)無(wú)縫設(shè)計(jì)

格式:pdf

大小:255KB

頁(yè)數(shù): 3頁(yè)

介紹了深圳市觀瀾河干流污染治理工程中一座超大型地下雨水調(diào)蓄池結(jié)構(gòu)采用無(wú)縫設(shè)計(jì)的情況。通過設(shè)置施工后澆帶、采用補(bǔ)償收縮混凝土、布置合理的結(jié)構(gòu)措施、優(yōu)化結(jié)構(gòu)材料及嚴(yán)格落實(shí)施工控制措施,取消了按規(guī)范設(shè)計(jì)所需要的結(jié)構(gòu)永久伸縮縫,解決了超大型地下雨水調(diào)蓄池、超長(zhǎng)混凝土結(jié)構(gòu)的裂縫控制問題,同時(shí)方便了施工,提高了調(diào)蓄池結(jié)構(gòu)的整體性。

精華知識(shí)

雨水調(diào)蓄池設(shè)計(jì)規(guī)范

最新知識(shí)

雨水調(diào)蓄池設(shè)計(jì)規(guī)范
點(diǎn)擊加載更多>>

相關(guān)問答

雨水調(diào)蓄池設(shè)計(jì)規(guī)范
點(diǎn)擊加載更多>>
專題概述
雨水調(diào)蓄池設(shè)計(jì)規(guī)范相關(guān)專題

分類檢索: