格式:pdf
大小:194KB
頁數(shù): 17頁
Environmental problems caused by Istanbul subway excavation and suggestions for remediation Ibrahim Ocak Abstract: Many environmental problems caused by subway excavations have inevitably become an important point in city life. These problems can be categorized as transporting and stocking of excavated material, traf?c jams, noise, vibrations, piles of dust mud and lack of supplies. Althou
格式:pdf
大?。?span class="single-tag-height">47KB
頁數(shù): 7頁
1 在巖土工程勘察中常見問題及改進(jìn)方法中英文淺析 In the geotechnical engineering investigation of English improvement and analysis of common problems in 我國(guó)的工程地質(zhì)勘查經(jīng)歷了長(zhǎng)期的發(fā)展過程, 發(fā)展方向已經(jīng)轉(zhuǎn)向了巖土工程勘察, 相關(guān) 的技術(shù)知識(shí)和人員也得到了很大發(fā)展, 巖土工程技術(shù)從人員知識(shí)到技術(shù)手段和勘測(cè)設(shè)備等等 都有了很大的進(jìn)步。 隨著我國(guó)經(jīng)濟(jì)改革的腳步加快, 勘察市場(chǎng)的競(jìng)爭(zhēng)也愈加激烈, 巖土工程 勘察工作出現(xiàn)了很多問題。 勘察工作的收費(fèi)越來越低, 使得很多單位不愿在這項(xiàng)工作中投入 資金購(gòu)置先進(jìn)的設(shè)備, 這就使得勘察的質(zhì)量和成果無法得到提升, 甚至還可能會(huì)降低, 這就 影響到很多與建筑工程密切相關(guān)的問題得不到解決。 Engineering geological prospect